- 积分
- 263
- 贡献
-
- 精华
- 在线时间
- 小时
- 注册时间
- 2017-4-12
- 最后登录
- 1970-1-1

|
GrADS
系统平台: |
WRF |
问题截图: |
- |
问题概况: |
WRF运行real.exe时出现错误。提示WARNING: traj_opt is zero, but num_traj is not zero; setting num_traj to zero. |
我看过提问的智慧: |
看过 |
自己思考时长(天): |
10 |
登录后查看更多精彩内容~
您需要 登录 才可以下载或查看,没有帐号?立即注册
x
各前辈好,请大家帮忙看看下面的问题(namelist附在后面)
问题: ×××@××:~/WRF/WRFV3/test/em_real$ ./real.exe
--- WARNING: traj_opt is zero, but num_traj is not zero; setting num_traj to zero.
--- NOTE: sst_update is 0, setting io_form_auxinput4 = 0 and auxinput4_interval = 0 for all domains
--- NOTE: grid_fdda is 0 for domain 1, setting gfdda interval and ending time to 0 for that domain.
--- NOTE: both grid_sfdda and pxlsm_soil_nudge are 0 for domain 1, setting sgfdda interval and ending time to 0 for that domain.
--- NOTE: obs_nudge_opt is 0 for domain 1, setting obs nudging interval and ending time to 0 for that domain.
--- NOTE: bl_pbl_physics /= 4, implies mfshconv must be 0, resetting
--- NOTE: RRTMG radiation is not used, setting: o3input=0 to avoid data pre-processing
--- NOTE: num_soil_layers has been set to 5
REAL_EM V3.7 PREPROCESSOR
*************************************
Parent domain
ids,ide,jds,jde 1 100 1 57
ims,ime,jms,jme -4 105 -4 62
ips,ipe,jps,jpe 1 100 1 57
*************************************
DYNAMICS OPTION: Eulerian Mass Coordinate
alloc_space_field: domain 1 , 1008318964 bytes allocated
Time period # 1 to process = 2016-06-01_00:00:00.
Time period # 2 to process = 2016-06-01_06:00:00.
Time period # 3 to process = 2016-06-01_12:00:00.
Time period # 4 to process = 2016-06-01_18:00:00.
Time period # 5 to process = 2016-06-02_00:00:00.
Time period # 6 to process = 2016-06-02_06:00:00.
Time period # 7 to process = 2016-06-02_12:00:00.
Time period # 8 to process = 2016-06-02_18:00:00.
Time period # 9 to process = 2016-06-03_00:00:00.
Time period # 10 to process = 2016-06-03_06:00:00.
Time period # 11 to process = 2016-06-03_12:00:00.
Time period # 12 to process = 2016-06-03_18:00:00.
Time period # 13 to process = 2016-06-04_00:00:00.
Time period # 14 to process = 2016-06-04_06:00:00.
Time period # 15 to process = 2016-06-04_12:00:00.
Time period # 16 to process = 2016-06-04_18:00:00.
Time period # 17 to process = 2016-06-05_00:00:00.
Time period # 18 to process = 2016-06-05_06:00:00.
Time period # 19 to process = 2016-06-05_12:00:00.
Time period # 20 to process = 2016-06-05_18:00:00.
Time period # 21 to process = 2016-06-06_00:00:00.
Time period # 22 to process = 2016-06-06_06:00:00.
Time period # 23 to process = 2016-06-06_12:00:00.
Time period # 24 to process = 2016-06-06_18:00:00.
Time period # 25 to process = 2016-06-07_00:00:00.
Time period # 26 to process = 2016-06-07_06:00:00.
Time period # 27 to process = 2016-06-07_12:00:00.
Time period # 28 to process = 2016-06-07_18:00:00.
Time period # 29 to process = 2016-06-08_00:00:00.
Time period # 30 to process = 2016-06-08_06:00:00.
Time period # 31 to process = 2016-06-08_12:00:00.
Time period # 32 to process = 2016-06-08_18:00:00.
Time period # 33 to process = 2016-06-09_00:00:00.
Time period # 34 to process = 2016-06-09_06:00:00.
Time period # 35 to process = 2016-06-09_12:00:00.
Time period # 36 to process = 2016-06-09_18:00:00.
Time period # 37 to process = 2016-06-10_00:00:00.
Time period # 38 to process = 2016-06-10_06:00:00.
Time period # 39 to process = 2016-06-10_12:00:00.
Time period # 40 to process = 2016-06-10_18:00:00.
Time period # 41 to process = 2016-06-11_00:00:00.
Time period # 42 to process = 2016-06-11_06:00:00.
Time period # 43 to process = 2016-06-11_12:00:00.
Time period # 44 to process = 2016-06-11_18:00:00.
Time period # 45 to process = 2016-06-12_00:00:00.
Time period # 46 to process = 2016-06-12_06:00:00.
Time period # 47 to process = 2016-06-12_12:00:00.
Time period # 48 to process = 2016-06-12_18:00:00.
Time period # 49 to process = 2016-06-13_00:00:00.
Time period # 50 to process = 2016-06-13_06:00:00.
Time period # 51 to process = 2016-06-13_12:00:00.
Time period # 52 to process = 2016-06-13_18:00:00.
Time period # 53 to process = 2016-06-14_00:00:00.
Time period # 54 to process = 2016-06-14_06:00:00.
Time period # 55 to process = 2016-06-14_12:00:00.
Time period # 56 to process = 2016-06-14_18:00:00.
Time period # 57 to process = 2016-06-15_00:00:00.
Time period # 58 to process = 2016-06-15_06:00:00.
Time period # 59 to process = 2016-06-15_12:00:00.
Time period # 60 to process = 2016-06-15_18:00:00.
Time period # 61 to process = 2016-06-16_00:00:00.
Time period # 62 to process = 2016-06-16_06:00:00.
Time period # 63 to process = 2016-06-16_12:00:00.
Time period # 64 to process = 2016-06-16_18:00:00.
Time period # 65 to process = 2016-06-17_00:00:00.
Time period # 66 to process = 2016-06-17_06:00:00.
Time period # 67 to process = 2016-06-17_12:00:00.
Time period # 68 to process = 2016-06-17_18:00:00.
Time period # 69 to process = 2016-06-18_00:00:00.
Time period # 70 to process = 2016-06-18_06:00:00.
Time period # 71 to process = 2016-06-18_12:00:00.
Time period # 72 to process = 2016-06-18_18:00:00.
Time period # 73 to process = 2016-06-19_00:00:00.
Time period # 74 to process = 2016-06-19_06:00:00.
Time period # 75 to process = 2016-06-19_12:00:00.
Time period # 76 to process = 2016-06-19_18:00:00.
Time period # 77 to process = 2016-06-20_00:00:00.
Time period # 78 to process = 2016-06-20_06:00:00.
Time period # 79 to process = 2016-06-20_12:00:00.
Time period # 80 to process = 2016-06-20_18:00:00.
Time period # 81 to process = 2016-06-21_00:00:00.
Time period # 82 to process = 2016-06-21_06:00:00.
Time period # 83 to process = 2016-06-21_12:00:00.
Time period # 84 to process = 2016-06-21_18:00:00.
Time period # 85 to process = 2016-06-22_00:00:00.
Time period # 86 to process = 2016-06-22_06:00:00.
Time period # 87 to process = 2016-06-22_12:00:00.
Time period # 88 to process = 2016-06-22_18:00:00.
Time period # 89 to process = 2016-06-23_00:00:00.
Time period # 90 to process = 2016-06-23_06:00:00.
Time period # 91 to process = 2016-06-23_12:00:00.
Time period # 92 to process = 2016-06-23_18:00:00.
Time period # 93 to process = 2016-06-24_00:00:00.
Time period # 94 to process = 2016-06-24_06:00:00.
Time period # 95 to process = 2016-06-24_12:00:00.
Time period # 96 to process = 2016-06-24_18:00:00.
Time period # 97 to process = 2016-06-25_00:00:00.
Time period # 98 to process = 2016-06-25_06:00:00.
Time period # 99 to process = 2016-06-25_12:00:00.
Time period # 100 to process = 2016-06-25_18:00:00.
Time period # 101 to process = 2016-06-26_00:00:00.
Time period # 102 to process = 2016-06-26_06:00:00.
Time period # 103 to process = 2016-06-26_12:00:00.
Time period # 104 to process = 2016-06-26_18:00:00.
Time period # 105 to process = 2016-06-27_00:00:00.
Time period # 106 to process = 2016-06-27_06:00:00.
Time period # 107 to process = 2016-06-27_12:00:00.
Time period # 108 to process = 2016-06-27_18:00:00.
Time period # 109 to process = 2016-06-28_00:00:00.
Time period # 110 to process = 2016-06-28_06:00:00.
Time period # 111 to process = 2016-06-28_12:00:00.
Time period # 112 to process = 2016-06-28_18:00:00.
Time period # 113 to process = 2016-06-29_00:00:00.
Time period # 114 to process = 2016-06-29_06:00:00.
Time period # 115 to process = 2016-06-29_12:00:00.
Time period # 116 to process = 2016-06-29_18:00:00.
Time period # 117 to process = 2016-06-30_00:00:00.
Time period # 118 to process = 2016-06-30_06:00:00.
Time period # 119 to process = 2016-06-30_12:00:00.
Time period # 120 to process = 2016-06-30_18:00:00.
Time period # 121 to process = 2016-07-01_00:00:00.
Total analysis times to input = 121.
-----------------------------------------------------------------------------
Domain 1: Current date being processed: 2016-06-01_00:00:00.0000, which is loop # 1 out of 121
configflags%julyr, %julday, %gmt: 2016 153 0.00000000
metgrid input_wrf.F first_date_input = 2016-06-01_00:00:00
metgrid input_wrf.F first_date_nml = 2016-06-01_00:00:00
-------------- FATAL CALLED ---------------
FATAL CALLED FROM FILE: <stdin> LINE: 862
input_wrf.F: SIZE MISMATCH: namelist ide,jde,num_metgrid_levels= 100 57 27 ; input data ide,jde,num_metgrid_levels= 100 57 32
-------------------------------------------
-------------- FATAL CALLED ---------------
FATAL CALLED FROM FILE: <stdin> LINE: 862
input_wrf.F: SIZE MISMATCH: namelist ide,jde,num_metgrid_levels= 100 57 27 ; input data ide,jde,num_metgrid_levels= 100 57 32
-------------------------------------------
namelist:
&time_control
run_days = 0,
run_hours = 720,
run_minutes = 0,
run_seconds = 0,
start_year = 2016, 2005, 2000,
start_month = 06, 08, 01,
start_day = 01, 28, 24,
start_hour = 00, 00, 12,
start_minute = 00, 00, 00,
start_second = 00, 00, 00,
end_year = 2016, 2005, 2000,
end_month = 07, 08, 01,
end_day = 01, 29, 25,
end_hour = 00, 00, 12,
end_minute = 00, 00, 00,
end_second = 00, 00, 00,
interval_seconds = 21600
input_from_file = .true.,.false.,.false.,
fine_input_stream = 0,0,0,
history_interval = 180, 60, 60,
frames_per_outfile = 1000, 1000, 1000,
restart = .false.,
restart_interval = 5000,
io_form_history = 2
io_form_restart = 2
io_form_input = 2
io_form_boundary = 2
debug_level = 0
/
&domains
time_step = 180,
max_dom = 1,
s_we = 1, 1, 1,
e_we = 100, 118, 94,
s_sn = 1, 1, 1,
e_sn = 57, 103, 91,
s_vert = 1, 1, 1,
e_vert = 30, 30, 30,
num_metgrid_levels = 27,
dx = 30000, 10000, 3333.33,
dy = 30000, 10000, 3333.33,
grid_id = 1, 2, 3,
parent_id = 1, 1, 2,
i_parent_start = 1, 31, 30,
j_parent_start = 1, 17, 30,
parent_grid_ratio = 1, 3, 3,
parent_time_step_ratio = 1, 3, 3,
feedback = 1,
/
&physics
mp_physics = 3, 3, 3,
ra_lw_physics = 1, 1, 1,
ra_sw_physics = 1, 1, 1,
radt = 30, 30, 30,
sf_sfclay_physics = 1, 1, 1,
sf_surface_physics = 1, 1, 1,
bl_pbl_physics = 0, 1, 1,
bldt = 0, 0, 0,
cu_physics = 1, 1, 0,
cudt = 5, 5, 5,
num_soil_layers = 5,
sf_urban_physics = 0, 0, 0,
/
&fdda
/
&dynamics
w_damping = 0,
diff_opt = 1, 1, 1,
km_opt = 4, 4, 4,
diff_6th_opt = 0, 0, 0,
diff_6th_factor = 0.12, 0.12, 0.12,
base_temp = 290.
damp_opt = 0,
zdamp = 5000., 5000., 5000.,
dampcoef = 0.2, 0.2, 0.2
khdif = 0, 0, 0,
kvdif = 0, 0, 0,
non_hydrostatic = .true., .true., .true.,
moist_adv_opt = 1, 1, 1,
scalar_adv_opt = 1, 1, 1,
/
&bdy_control
spec_bdy_width = 5,
spec_zone = 1,
relax_zone = 4,
specified = .true., .false.,.false.,
nested = .false., .true., .true.,
/
&grib2
/
&namelist_quilt
nio_tasks_per_group = 0,
nio_groups =1
/
102,1 底端
|
|